https://www.miningweekly.com

Eurasia’s Monchetundra mining permit in ‘final stages’

3rd July 2018

By: Simone Liedtke

Creamer Media Social Media Editor & Senior Writer

     

Font size: - +

Aim-listed Eurasia Mining on Tuesday announced the approval of the Monchetundra mine permit application by the Russian Ministry of Economic Development (MOED).

The mine permit application, for the 80%-owned two-million-ounce platinum-group metals (PGM) reserve and resource, is now awaiting sign off at the Ministry of Natural Resources, before progressing to the office of Prime Minister Dmitry Medvedev for final approval.

The PGM and gold producing company said that the application process remained on track to be completed by late summer.

CEO Christian Schaffalitzky dubbed the approval “another key milestone that came sooner than expected”.

He explained that the process was entering its final stage of approval before the anticipated signing at the office of the Prime Minister.

So far, the application has progressed faster than at the West Kytlim project, he noted.

Currently, State-approved reserves and resources within the Monchetundra project comprise Russian standard C1 and C2 categories of 55.9 t, about two-million ounces, of palladium equivalent at two open-pittable locations, West Nittis and Loipishnune.

These openpits also contain significant gold and base metal credits including 28 124 t of copper, 30 410 t of nickel and 2 t of gold.

Eurasia Mining directors believe the project to be unique globally in being led by high palladium grades, and that it represents a significant lower cost openpit mining operation, which compares favourably to the relatively expensive underground operations in South Africa.

An engineering, procurement, construction and finance agreement is already in place with Chinese State-owned infrastructure group Sinosteel, which has arranged 85%, or $149.6-million, of the contract value as debt.

A further $50-million sub-contract has been assigned by Sinosteel to Eurasia's subsidiary Terskaya Gornaya Kompany for the development of the two openpits in preparation for mining and may be drawn down in advance of the main mine construction.

Meanwhile, discussions continue with other third-party service providers regarding the running of the mine at Monchetundra.

Eurasia hopes to emulate the contract mining arrangement used at West Kytlim by contracting the mining operation to a reputable international specialist company with experience in Russia, while maintaining control of the project, for a percentage of gross revenue.

Edited by Mariaan Webb
Creamer Media Senior Deputy Editor Online

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION