https://www.miningweekly.com

DRC Mining Code draft regulations complete, but industry still hopes for changes

15th May 2018

By: Marleny Arnoldi

Deputy Editor Online

     

Font size: - +

JOHANNESBURG (miningweeekly.com) – Major mining companies operating in the Democratic Republic of Congo (DRC) remain hopeful that meaningful changes can still be made to the 2018 Mining Code.

The DRC commission established to draft the regulations to effect the mining code has officially completed its work.

The commission will now report back to the Minister of Mines, who will then work with the inter-Ministerial commission ahead of presenting it to government for approval, said members of the DRC mining industry – representing more than 85% of DRC’s copper, cobalt and gold production and significant development projects.

The industry representatives, including miners Randgold Resources, Glencore, Ivanhoe Mines, Gold Mountain International/Zijin Mining Group, MMG, Crystal River Global and China Molybdenum, as well as AngloGold Ashanti, participated actively in the process and influenced a number of the regulations arising from the code.

However, because the commission’s terms of reference were restricted to the regulations, it could not deal with key issues, notably around the rights vested under the former code, the mining companies stated.

A detailed proposal dealing with these key issues was submitted to the Minister of Mines by the industry in March.

The industry is still awaiting a formal response to this proposal, which assumed the honouring of these rights and offered a sliding scale on royalties, allowing the government to benefit from rising commodity prices.

The industry representatives said they would continue to engage with government at all levels, as well as with influential organisation Civil Society – a member of the Mining Code revision tripartite group.

The industry representatives believe flaws in the current provisions of the new code would immediately cause numerous practical and legal problems, which would have a negative impact on the development of the DRC’s mining industry, as well as the country’s long-term economic prospects.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION