https://www.miningweekly.com

DNI inks flake graphite offtake deal with Korea Graphite

16th January 2018

By: Henry Lazenby

Creamer Media Deputy Editor: North America

     

Font size: - +

VANCOUVER (miningweekly.com) – Madagascar-focused graphite project developer DNI Metals has signed a binding supply agreement with ASX-listed Peninsula Mines’ subsidiary Korea Graphite to supply up to 24 000 t/y of flake graphite, the company announced on Monday.

The deal is subject to Korea Graphite finalising offtake agreements with Korean end-users, starting during the fourth quarter. The binding supply agreement is seen as a key precursor to establishing binding offtake agreements with Korean flake-graphite end-users.

Further, under a cooperative memorandum of understanding signed between the two parties in August last year, Korea Graphite and DNI will continue to discuss potential development cooperation in order to fast-track DNI's Madagascar flake-graphite projects, including potential for investment in a processing plant and/or investment in DNI’s new graphite property.

Peninsula has established strong relationships with Korean end-users that are looking to secure flake-graphite supply for lithium-ion battery anode production as well as for cutting-edge new technologies such as expandable graphite, a non-flammable building cladding/insulation product.

CSE-listed and Toronto-based DNI owns two permitted, saprolite-hosted graphite projects in Madagascar, namely Vohitsara and Marofody, which are located 50 km from the country's main seaport. These projects are adjoining, with the bulk of their respective mineralisation located between 2 km and 4 km from the paved national highway that bisects the tenement area.

DNI intends to develop both the Vohitsara and Marofody projects, should the economic viability and technical feasibility be established through future preliminary economic assessments and mining studies.

DNI also has a graphite wholesale business, in which it buys and sells high-quality graphite. This business has shown a steady increase in volume over the past year, according to DNI.

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION