Cyclone zircon project, Australia
Name of the Project
Cyclone zircon project.
Location
Eucla basin of Western Australia.
Client
ASX-listed emerging mineral sands miner Diatreme Resources.
Project Description
A definitive feasibility study (DFS) has confirmed Cyclone’s potential as a profitable new zircon mine worthy of advancing to immediate development. The project is expected to have a life-of-mine (LoM) production of 1.94-million tonnes of heavy mineral concentrate, containing 936 000 t of zircon, producing 772 000 t of final zircon product.
About 58 790 t/y of zircon is expected to be delivered over a 13.2-year LoM.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The project has an after-tax net present value, at a 10% discount rate, of $113-million and an internal rate of return of 27%, with a payback of 2.7 years.
Value
Project development costs are estimated at $135.6-million.
Duration
The project will take about two years to complete.
Latest Developments
Diatreme is hoping to secure a development partner by mid-2019.
The company is also in offtake discussions with several heavy mineral concentrate companies in China.
Key Contracts and Suppliers
China ENFI Engineering Corporation (DFS) and Mineral Technologies (wet concentrator plant).
On Budget and on Time?
Too early to state.
Contact Details for Project Information
Diatreme Resources, tel +61 7 3397 2222 or email manager@diatreme.com.au.
Comments
The
content
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation