Caula to produce by 2019 – Mustang
PERTH (miningweekly.com) – A strategic review into the Caula graphite and vanadium project, in Mozambique, has found that the project could produce its first product by mid-2019.
ASX-listed Mustang Resources told shareholders that the review also established that the Stage 1 Caula project would produce vanadium concentrate, which can be either sold or stockpiled for further processing to high purity vanadium products as part of Stage 2.
The Stage 1 operation is expected to produce some 100 000 t/y of ore, delivering between 10 000 t/y and 15 000 t/y of high-grade graphite concentrate, with the graphite plant being designed to allow future incorporation of all processing equipment into a larger Stage 2 graphite plant.
The Stage 2 operation will deliver between 300 000 t/y and 600 000 t/y of ore, with a large, full-scale processing plant delivering between 50 000 t/y to 75 000 t/y of high-grade graphite concentrate.
With a hypothetical ore grade of 0.4% vanadium pentoxide, a 600 000 t/y operation could produce about 2 000 t/y of vanadium pentoxide with a current market value of around $60-million a year.
The review was conducted alongside a concept study, which is set for completion by the second quarter of this year.
Comments
The
content
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation