https://www.miningweekly.com

Cadia processing resumes, full production expected in coming weeks

4th April 2018

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – Processing operations at the Cadia gold mine, in New South Wales, have resumed over the Easter Weekend.

Newcrest progressively suspended operations at the Cadia East operations in March, following a limited breakthrough of tailings material at the northern tailings facility.

Mining operations at Cadia were restarted at the end of last week.

The gold major has now reported that tailings from the Cadia operation were being deposited into the southern tailings facility, with the processing facilities currently running at a rate of around eight-million tonnes a year, owing to limitations in infrastructure at the southern tailings facility.

Work was continuing on evaluating the cause of the northern tailings facility embankment slump, with a prohibition notice on depositing tailings in this facility remaining in place.

Meanwhile, mining from Panel Cave 1 is being conducted at a rate of 11-million tonnes a year, with test and response production from Panel Cave 2 starting over the weekend.

The gold miner expected to be at full mining rates within the coming weeks.

Furthermore, Newcrest is also progressing evaluation and readiness of the Cadia Hill openpit as a tailings facility. The company is progressing a permit to initially use the bottom 200 m of the now defunct Cadia Hill openpit for tailings storage and to use it in conjunction with the southern tailings facility to provide enough storage capacity to enable Cadia to return to full production.

Edited by Mariaan Webb
Creamer Media Senior Deputy Editor Online

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION