Brazil's Vale expects 2017 iron-ore output to be below forecast
SAO PAULO/RIO DE JANEIRO – Vale SA expects full-year iron-ore output to come in at the lower end of forecasts this year, and below expectations in 2017, a sign the world's No. 1 producer of the raw material is effectively reining in production at low-margin facilities.
Iron-ore output was 86.823-million tonnes in the second quarter, down 2.8% from a year earlier, Rio de Janeiro-based Vale said in a report on Thursday.
Production trends in the first six months suggest ore output will end the year at the lower end of Vale's forecast range of between 340-million tonnes and 350-million tonnes, the report said. In 2015, Vale produced 345.9-million tonnes of the steelmaking raw material.
Vale said it would continue to replace high-cost tonnes and expected production in 2017 to be below its previous forecast of between 380-million tonnes and 400-million tonnes.
An expected fall in yearly production this year compared to 2015 comes despite an increase in output from Carajas, Vale's low-cost mining complex in the Amazon, indicating the company is successfully phasing out more expensive ore from older mines in the state of Minas Gerais.
The strategy of more controlled production growth comes after iron-ore prices fell by about a quarter since 2014. Prices fell to their weakest on record late last year, before recovering by around 50%, but analysts say the market will remain oversupplied for the foreseeable future.
This has resulted in slower growth, or reduction, in output across the board. Rivals BHP Billiton and Anglo American both reported slight setbacks in their iron ore production this week.
Vale also reported a rise in nickel production in the second quarter to 78 500 t, up 17% from the same period last year, due to improved performance at mines in Indonesia and Brazil.
In contrast, coal production fell 25% to 1.5-million tonnes due to parts of the underground Carborough Downs mine in Australia collapsing in May, causing production to be stopped.
Comments
The
content
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation