BHP trims forecasts for US, China GDP growth due to trade conflict
MELBOURNE – The world's biggest miner BHP Billiton has trimmed its expectations of global growth for next year and 2020 due to a "lose-lose" result from the US-China trade conflict, a senior executive said on Tuesday.
BHP's modelling suggested the trade row would cut both Chinese and US GDP growth by about a half to three quarters of a percentage point, COO Arnoud Balhuizen told the IMARC mining conference in Melbourne.
"Which confirms that the trade protection will create a lose-lose outcome," he said.
BHP has "not yet seen any material impact on our business," he added.
China's economy grew by a slower-than-expected 6.5 percent in the third quarter, its weakest pace since the global financial crisis, and analysts believe business conditions will get worse before they get better.
Meanwhile, the United States is preparing to announce tariffs on all remaining Chinese imports by early December if talks next month between presidents Donald Trump and Xi Jinping fail to ease the trade war, Bloomberg reported on Monday, citing unnamed sources.
"We have to be realistic that the current situation will not be solved easily," Balhuizen said.
However, despite rising trade tension hitting global growth, less trade between China and the United States would open the door to increased trade elsewhere.
"There's a lot of other countries around the Sino-US trade protection scenario which are actively upping their trade," he said.
Comments
The
content
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation