BC Iron launches PFS on salt project
PERTH (miningweekly.com) – A scoping study into the Mardie salt project, in the Pilbara, has found that the project could support a production rate of between 3-million and 3.5-million tonnes a year over a mine life of 20 years.
ASX-listed BC Iron on Wednesday told shareholders that the scoping study estimated a capital cost of between A$225-million and A$255-million, with operating costs estimated at between A$19/t and A$21/t free-on-board, while Mardie was expected to generate average revenues of around A$45/t.
The project would have a net present value of between A$290-million and A$380-million, depending on annual production, while the internal rate of return varied from 25% to 27%.
“The Mardie scoping study is another positive step towards realising BC Iron’s broader strategy of developing a diversified minerals portfolio. Importantly, the development plan for Mardie envisages using BC Iron’s proposed Cape Preston East port, strengthening its potential to become a multi-user, multi-commodity export facility,” said BC Iron MD Alwyn Vorster.
Based on the results of the scoping study, BC Iron will now undertake a prefeasibility study on the project, which will be completed by the end of 2017, after which the company will consider partnership options to fund and develop the Mardie project.
“Mardi’s economics appear robust at this early stage, and BC Iron aims to refine cost estimates and financial assumptions over the next few months as part of the prefeasibility study.
"In addition to the diversification into the potash industry, the Mardie salt project could further support BC Iron’s mission of maintaining a strong position in iron-ore, creating a presence in gold and base metals, and becoming a leading Australian player in the agricultural and industrial minerals industry.”
Comments
The
content
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation