https://www.miningweekly.com

Bacanora secures $150m debt for Mexico lithium project

5th July 2018

By: Marleny Arnoldi

Deputy Editor Online

     

Font size: - +

The Sonora lithium project is one step closer to fruition with Bacanora Lithium on Thursday announcing that it had secured $150-million in debt for the development of Stage 1 of the Mexico mine.

The company has signed a senior debt facility with RK Mine Finance, which CEO Peter Secker said was agreed on competitive terms, when compared with other debt packages recently reported for greenfield lithium projects in Canada and Australia.

The debt facility is structured as two Eurobonds, with the main $150-million bond carrying a six-year term and bearing interest at the three-month London Interbank Offered Rates (Libor) plus 8% a year. Interest will be capitalised every three months for the first 24 months and thereafter interest will be paid every three months in cash.

The second $56-million bond has a 20-year term and is repayable by reference to monthly production of lithium at a rate of $160/t of lithium produced, with any remaining amount repayable at the end of the 20-year term.

The competitive terms, Secker added, further validated the quality of Sonora’s battery grade (more than 99.5% lithium carbonate) and its potential to become a leading supplier of high-value lithium products to fast-growing industries such as electric vehicles and energy storage.

Bacanora is continuing discussions with offtake partner Japanese trading company Hanwa and other strategic investors to complete the proposed Stage 1 development funding package.

“We continue to talk with other important participants in the lithium space with a view to securing additional high quality strategic partners, as we focus on entering into the construction phase of what we believe will be the next significant producer of battery grade lithium carbonate,” Secker said.

Stage 1, which will produce 17 500 t/y of lithium carbonate, will cost about $419.62-million and Stage 2, which will expand production to 35 000 t/y, will cost about $380.26-million.

Last month, a feasibility study confirmed the positive economics and favourable operating costs of the project. The study assigned a pre-tax $1.2-billion net present value to the Sonora project, which is anticipated to start production in 2020.

Edited by Mariaan Webb
Creamer Media Senior Deputy Editor Online

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION