https://www.miningweekly.com

B2Gold inks earn-in accord for Namibian asset with Forsys Metals

15th January 2016

By: Henry Lazenby

Creamer Media Deputy Editor: North America

  

Font size: - +

TORONTO (miningweekly.com) – Gold miner B2Gold has struck an earn-in accord with uranium-focused project developer Forsys Metals to earn a 100% interest in the Ondundu gold project, in Namibia.

B2Gold, which has a portfolio of projects in Africa, South America and the Philippines, started production at the Otjikoto gold mine in north-central Namibia in December 2014 and, if it successfully completes the earn-in, will gain another gold asset not far from its existing infrastructure.

Under terms of the agreement B2Gold, as project manager, would be required to spend $900 000 in the first 12 months to acquire a 25% interest in the property.

Should B2Gold exercise its first right, it would be required to spend a further $1.1-million in the second 12 months to acquire a further 24% interest in Ondundu. After this phase, B2Gold would be required to spend an additional $1.3-million in the third year of the agreement, to acquire another 26% interest.

B2Gold and Forsys could also separately exercise a call or put in an option to transfer the balance of Ondundu for $8.5-million after 24 months or 36 months, respectively.

Forsys CEO Marcel Hilmer said the earn-in agreement with B2Gold ensured a strong financial commitment to develop Ondundu.

According to Forsys, Ondundu was discovered in 1917, and is located in the Northern zone of the Neoproterozoic Damara Orogen of north-central Namibia. Historic data from Goldfields indicates a resource of about 500 000 oz of gold, contained in 4.5-million tonnes grading 3.39 g/t.

Meanwhile, B2Gold on Thursday reported record quarterly consolidated gold output of 131 469 oz for the fourth quarter ended December 31 – an 18% improvement over the same period in 2014.

The company recorded gold revenue of $139-million, on record sales of 127 482 oz at an average price of $1 090/oz.

Edited by Samantha Herbst
Creamer Media Deputy Editor

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION