https://www.miningweekly.com

Avanco takes option on Vale’s Pantera copper project

16th January 2018

By: Megan van Wyngaardt

Creamer Media Contributing Editor Online

     

Font size: - +

JOHANNESBURG (miningweekly.com) – ASX-listed Avanco has agreed terms for an option to acquire 100% of the Pantera copper project from Brazilian major Vale, with a payment of $500 000 paid upon signing.

Located near Avanco’s existing operations in the Carajás mineral province, in Brazil, the 9 700 ha Pantera licence has the potential to significantly add resources, reserves and a longer-term production profile for the company.

The option provides Avanco the right to acquire 100% of Pantera by either completing 14 000 m of drilling within two years and subsequently agreeing Joint Ore Reserves Committee- (Jorc-) compliant measured and indicated resources hosted within the whole of the historical mineralised zone, thereafter establishing the acquisition price calculated at $0.04/lb of contained copper. 

Avanco can then exercise the option by starting payment of the acquisition monies to Vale. Following the exercise of the option, beyond two years and up to five years, Avanco shall complete the drilling in the historical mineralised zone and any contained copper in addition to 400 000 t will incur a higher acquisition price based on an incremental cost of $0.06/lb of copper.

The option can also either be exercised at any time, with or without drilling, by agreeing on a non-Jorc-compliant estimation of 400 000 t of contained copper within the zone valued at $0.04/lb of copper. 

In both cases, payment of the acquisition price is capped at $3-million a year.

Management estimate the acquisition cost will likely range between $20-million and $35-million, determined largely by the strategy adopted.

Consequently, it is anticipated that the payment period will be spread over a seven- to twelve-year period. 

On electing to exercise the option and making the first yearly payment, Vale will transfer the mineral rights to Avanco. 

Any copper resources discovered by Avanco outside the historical mineralised zone will not attract an increase to the acquisition price. 

Any future production from resources hosted outside of the historical mineralised zone, but within the boundaries of Pantera, will be subject to a net smelter return royalty to Vale of 1% on copper.

The agreement obliges Avanco to honour an underlying royalty previously assigned to the Brazilian Development Bank of 1.5% on gross revenue.

Edited by Mariaan Webb
Creamer Media Senior Deputy Editor Online

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION