https://www.miningweekly.com

AuRico Gold, First Nations ink impact benefit accord

19th May 2017

By: Henry Lazenby

Creamer Media Deputy Editor: North America

     

Font size: - +

VANCOUVER (miningweekly.com) – TSX-listed AuRico Metals and First Nations surrounding the Kemess underground project have signed an impact benefits agreement (IBA) for the Kemess underground project, in British Columbia, solidifying local relationships and ensuring the project provides economic opportunities and benefits to the region and local stakeholders.

Toronto-based AuRico signed the IBA with the Takla Lake, Tsay Keh Dene and Kwadacha First Nations, who are together called the Tse Keh Nay (TKN) – an alliance of three Sekani First Nations.

The IBA provides a framework that formalises the long-term cooperative relationship between AuRico and the TKN First Nations over the life of the project. The IBA captures the mutual commitment to consult and maintain an open, respectful and cooperative relationship throughout the development and operation of the Kemess underground project.

The IBA further provides for meaningful TKN participation in the project through training, employment, business opportunities, environmental protection and other means.

"In order to celebrate the success we have achieved today, we must look back to the path that got us here. The original plan for Kemess North was to use Amazay Lake as a tailings pond. It was through our struggles to protect that sacred lake that the Tsay Keh Nay alliance was reunited and strengthened.

“Through the development of the Kemess underground project, the Tsay Keh Nay alliance has remained strong; and continues to support each other in the pursuit of environmental integrity, cultural revitalisation and community health. Today, Tse Keh Nay recognises the environmental commitment made by AuRico Metals, and the respect for Tse Keh Nay rights, interests and genuine collaboration with the Tse Keh Nay alliance,” Tse Keh Nay chiefs said in a joint statement.

The Kemess project has about $1-billion of existing infrastructure on care and maintenance on site, which will dramatically reduce the expected capital expenditures to first production to just under $400-million.

The Kemess underground project and the Kemess East deposits currently hold about 3.34-million ounces of gold in the proven and probable mineral reserve categories, 6.66-million ounces gold in the indicated resource category, and another 2.26-million ounces in the inferred category.

AuRico believes there is significant exploration upside, especially at Kemess East, where the deposit remains open in several directions.

A 2016 feasibility study on the project calculated a net present value, at a 5% discount, of C$421-million, with an internal rate of return of 15.4%.

Edited by Creamer Media Reporter

Comments

The functionality you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION