https://www.miningweekly.com

Atlas Sept quarter iron-ore shipments down 10%

25th October 2018

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – Iron-ore miner Atlas Iron has reported another tough quarter in the three months to September, with iron-ore shipments declining from 2.1-million tonnes in the June quarter, to 1.9-million tonnes.

Atlas in late July this year suspended crushing activities at its Mt Dove operation, in the Pilbara, and reduced the mining rate at its Mt Webber operation to about seven-million tonnes a year, resulting in decreased shipments for the quarter.

As a result of the suspension of the Mt Dove operation, and the inclusion of inventory impaired at the 2018 year-end in the sales volumes, Atlas’ C1 cash costs for the quarter decreased from the A$42/t reported in the June quarter, to A$40/t.

However, full-cash costs for the same period increased from A$62/t to A$64/t, with Atlas telling shareholders that the increase was owing to an upsurge in freight rates as a result of a competitive shipping market and increased royalty charges.

Atlas achieved an average iron-ore price of A$67/t during the September quarter, which was a significant improvement on the A$59/t in the June quarter, driven by improved benchmark prices, increased lump premiums, and a softening in the Australian dollar.

In addition to its iron-ore shipments, Atlas shipped 170 000 t of lithium direct shipping ore in the September quarter, following its first exports in the June quarter.

Atlas is likely to be delisted from the ASX, after suitor Redstone Corporation, a subsidiary of Hancock Prospecting, obtained a 93% interest in the company following a takeover offer that closed on October 12.

Redstone has advised that it would initiate a compulsory acquisition of the remaining shares in Atlas, and would remove the company from the official ASX list once this process was complete.

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION