Assay results at Cora Gold’s Sanankoro continue to be encouraging
Aim-listed Cora Gold on Monday reported encouraging assay results from its Sanankoro gold project, in southern Mali, which CEO Dr Jonathan Forster says confirms previous work at the Zone A area of the project.
“The overall scale and quality of Sanankoro is remarkable. We have received consistently encouraging results from drilling at this project, with today's assay results from core drilling confirming previous work at the Zone A area of the project. It is pleasing to see confirmation of the higher grades that can be achieved in these types of heterogeneous quartz stockwork systems,” he enthused.
In addition, Cora’s step-out reconnaissance drilling north of Zone B continues to demonstrate the large-scale potential of the Sanankoro gold zone, Forster said, which has now been extended to some 5.2 km, and with every potential for it to continue to grow.
Further, gold assay results from a reconnaissance drill programme have now extended the Sanankoro gold zone to over 5 km in length, from the southern end of Zone A through to the new extension confirmed north of Zone B.
The latest aircore and reverse circulation drill programme comprised a set of six drill fences set typically between 240 m and 280 m apart, except for one fence where access constraints across an alluvial plain increased the intervening distance to 600 m, Cora Gold stated.
A distance of some 1.6 km of strike length has been covered by this reconnaissance drilling.
Anomalous gold values were locally recovered in these areas, pointing to the likely presence of the gold structure.
Comments
The
content
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation