Ardmore on track for 2019
PERTH (miningweekly.com) – ASX-listed Centrex Metals on Wednesday told shareholders that the start-up operation at its Ardmore phosphate rock project, in Queensland, was on track to start production in 2019, with commissioning targeted for mid-2019.
The start-up operation is targeted at producing some 30 000 t of concentrate to provide priority customers with trial shipments in order to secure long-term offtake contracts to underpin project financing for the full-scale project.
The start-up plant will have a 70 t/h capacity and has been designed with the option to expand to the 140 t/h full-scale operation.
A previously completed definitive feasibility study (DFS) estimated that the full-scale project would require a capital investment of around A$77-million to produce 800 000 t/y of premium-grade phosphate rock concentrate over a mine life of ten years.
However, since the completion of the DFS, Centrex has identified some A$5.7-million in capital savings and A$3/t in operating cost savings at the project, with a number of other cost saving initiatives currently being assessed.
Full scale production has been targeted for the start of 2021.
Comments
The
content
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation