Alcoa to shutter two Brazil smelters
TORONTO (miningweekly.com) – US-based alumina and aluminium producer and refiner Alcoa on Friday said that the continued challenging global market conditions in primary aluminium, and increased costs, had made two smelters in Brazil uncompetitive, and would, therefore, be closed at the end of May.
NYSE-listed Alcoa announced that it would curtail 147 000 metric tons of smelting capacity at its São Luís (Alumar) and Poços de Caldas smelters.
Last year, the company curtailed 97 000 metric tons at São Luís and 34 000 metric tons at Poços. The new curtailments would include the remaining 62 000 metric tons of capacity from the Poços smelter, resulting in a full curtailment of its three potlines. Another 85 000 metric tons would be curtailed at São Luís.
“Across the globe, we are taking measures to curtail high-cost smelting capacity that is not competitive and reshape our cost profile. These are difficult but necessary actions in support of Alcoa’s strategy to lower the cost base of our upstream businesses,” Alcoa global primary products president Bob Wilt said.
At Poços, the refinery would also reduce production; however, the mine, aluminium powder plant and casthouse would continue normal operations, as would the refinery at São Luís.
Other Alcoa operations in Brazil were not affected.
In May last year, Alcoa placed 460 000 t of smelting capacity under review. Once all announced curtailments and closures had been completed, the company would have about 800 000 t, or 21%, of smelting capacity offline.
Total after-tax restructuring-related charges associated with the Brazil curtailments in the first quarter were expected to be between $40-million and $50-million, or $0.04 to $0.05 a share, of which about 30% would be noncash.
Comments
The
functionality
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation