https://www.miningweekly.com

Alamos rises on positive exploration results at Mulatos satellite deposits

13th September 2016

By: Henry Lazenby

Creamer Media Deputy Editor: North America

  

Font size: - +

VANCOUVER (miningweekly.com) – The TSX-listed stock of Canadian gold producer Alamos Gold on Monday rose nearly 12% after it reported positive exploration results on the 100%-owned La Yaqui and Cerro Pelon satellite deposits, located near the Mulatos mine, in Mexico.

The Toronto-headquartered company advised that the compliant resources at La Yaqui had grown by 93% to 536 000 oz, including the original 89 000 oz reserve, and that the average resource grade rose 5.6% to 1.5 g/t (undiluted). This compares well with the average Mulatos oxide reserve grade of about 0.9 g/t (diluted).

The original La Yaqui reserve pit remains on schedule to start production in mid-2017.

Exploration activities would continue at La Yaqui at an “aggressive pace” throughout the remainder of the year, Alamos advised. A total of eight rigs are currently drilling with a further 10 000 m planned by the end of the year.

The focus will be on infill drilling the inferred mineral resources, extension drilling on both zones and scout drilling over the remainder of the large alteration anomaly. Alamos noted that only 25% of the large alteration anomaly at La Yaqui had been explored to date.

The new resource, upgrading 149 000 oz to an indicated mineral resource and expanding the higher-grade inferred mineral resource to 298 000 oz, was upgraded and expanded from 27 201 m of drilling over eight months.

Meanwhile, Alamos advised that, owing to continued exploration success immediately next to the openpit plan at Cerro Pelon, it would delay the environmental impact assessment submission to ensure this upside is captured in the development of the project. This will probably move Cerro Pelon’s start-up date into 2018.

Alamos's TSX-listed stock closed Monday up 11.9% at C$11.47 apiece.

Edited by Samantha Herbst
Creamer Media Deputy Editor

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION