https://www.miningweekly.com

$5.48bn Panama project on track for 2018 commissioning

18th May 2017

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – The $5.48-billion Cobre Panama copper project, being developed by First Quantum Minerals, is on track for commissioning in 2018.

Speaking at the Paydirt Latin America Downunder conference, in Perth, First Quantum global exploration director Mike Christie said on Thursday that the company was targeting a throughput rate of 60-million tonnes by the end of December, with full capacity of 75-million tonnes a year targeted in 2019, to deliver around 320 000 t/y of copper.

First Quantum would spend about $1-billion on project construction in 2017, Christie said, noting that the project was some 50% complete by the end of April this year.

A further $830-million on project capital will be spent in 2018, with a final $110-million to be spent in 2019.

Once in full production the Cobre Panama project, which is the largest capital project in Panama, rivalling the Panama Canal in terms of capital spend, will push First Quantum’s total copper production to over 900 000 t/y, making the company one of the largest copper producers in the world.

Christie pointed out that the development of First Quantum’s Haquira copper project, in Peru, and its Taca Taca copper project, in Argentina, would place the company in the ranks of top global producers, including BHP and Glencore.

First Quantum is currently working on an environmental impact assessment at both the Haquira and Taca Taca projects.

Edited by Mariaan Webb
Creamer Media Senior Deputy Editor Online

Comments

The functionality you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION