https://www.miningweekly.com

Zim mulling readmission to LBMA as gold output exceeds 10 t/y for the first time since 2008

28th November 2014

By: Oscar Nkala

Creamer Media Correspondent

  

Font size: - +

Zimbabwe’s principal gold buyer, Fidelity Printers & Refiners, says the gold delivered to its mills in the last ten months amounts to 11.11 t, exceeding the 10 t required for readmis- sion to the London Bullion Market Asso- ciation (LBMA) for the first time in six years.

In an update circulated to the media last week, Fidelity, a Reserve Bank of Zimbabwe subsidiary, says large-scale miners had delivered 8.3 t, while small-scale miners delivered 2.7 t.

Fidelity has already notified the LBMA that Zimbabwe, which was deregistered in 2008, when yearly gold production plunged to below 2 t, intends to apply for readmission to the world’s prestigious gold-buying club.

According to figures from the company, large-scale gold producers have been delivering a monthly average of 827 kg, while deliveries from small-scale miners have averaged 54 kg/m since the beginning of the year.

Metallon Gold’s How mine, near Zimbabwe’s second city of Bulawayo, delivered 2.4 t, Mwana Africa’s Freda Rebecca mine delivered 1.5 t, Caledonia’s Blanket mine 1.1 t, RioZim 537 kg, Forbes & Thompson Mines 328 kg and Falcon Gold’s Lulu mine delivered 252 kg.

Addressing a press conference in Harare earlier this month, Mines and Mining Development Minister Walter Chidhakwa said gold deliveries to Fidelity
Printers had increased from an average of 200 kg to 400 kg a month.

He said, judging by the gold deliveries made so far, the country was on course to achieve the revised annual gold production target of 13 t this year.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Showroom

Immersive Technologies
Immersive Technologies

Immersive Technologies is the world's largest, proven and tested supplier of simulator training solutions to the global resources industry.

VISIT SHOWROOM 
Rio-Carb
Rio-Carb

Our Easy Access Chute concept was developed to reduce the risks related to liner maintenance. Currently, replacing wear liners require that...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 19 April 2024
Magazine round up | 19 April 2024
19th April 2024
Resources Watch
Resources Watch
17th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.104 0.152s - 88pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: