GOLD 1566.55 $/ozChange: 0.90
PLATINUM 1425.50 $/ozChange: 2.00
R/$ exchange 8.38Change: 0.02
R/€ exchange 10.49Change: 0.06
 
We have detected that the browser you are using is no longer supported. As a result, some content may not display correctly.
We suggest that you upgrade to the latest version of any of the following browsers:
         
close notification
powered by
Advanced Search
 
 
 
Home
 
World News
 
Australasia
 
 
GOLD
Yukon-Nevada restarts gold production at Jerritt Canyon
 
6th February 2012
TEXT SIZE
Text Smaller Disabled Text Bigger
 

Canada's Yukon-Nevada Gold Corp said it restarted gold production at its Jerritt Canyon mill in Nevada, United States.

Yukon-Nevada, which also owns gold, silver, zinc and copper assets in Canada's Yukon territory and British Columbia, said it expects the plant to produce 9 000 oz of gold in February and 12 500 oz in March.

Production at the mine was halted a month ago for a plant refurbishment.

Shares of the company had closed at 30.5 Canadian cents on Friday on the Toronto Stock Exchange.

Edited by: Reuters

To subscribe to Mining Weekly's print magazine email subscriptions@creamermedia.co.za or buy now.

Subscribe Now Login