Western Turner syncline iron-ore project, Australia
Name of the Project
Western Turner syncline iron-ore project.
Location
Australia.
Client
Hamersley Iron, a subsidiary of Rio Tinto.
Project Description
Hamersley is proposing a change to the approved Western Turner syncline iron-ore project, which incorporates:
• the Western Turner syncline Section 10 iron-ore project, which includes an above-water-table opencut mine and a link to the existing Tom Price mine operation, with an infrastructure corridor; and
• the Western Turner syncline Stage 2 – B1 and Section 17 deposits for an above- and below-water-table opencut mine and associated infrastructure.
The proposal includes the following additional components:
• an above- and below-water-table extension of the approved Section 10 BRK pit,
• the development of the above-water-table Section 10 BRK West pit;
• the development of the above- and below-water-table Section 10 MM East and MM West pits; and
• the discharge of surplus mine dewatering into the northern branch of the Hardey river.
Jobs to be Created
Forty jobs are expected to be created during construction.
Net Present Value/Internal Rate of Return
Not stated.
Value
Rio is expected to spend about A$18-million on construction.
Duration
Not stated.
Latest Developments
Contract mining has been suspended at mining major Rio Tinto’s Western Turner Syncline Stage 2 iron-ore project.
Mining contractor Brierty received a notice of default from Rio Tinto on June 21, with the diversified miner raising safety concerns.
Brierty has 14 days to respond to the notice of default, with the company telling shareholders that it is confident it can provide Rio Tinto with the assurance it requires to resume operations.
Key Contracts and Suppliers
Brierty (mining contractor).
On Budget and on Time?
Not stated.
Contact Details for Project Information
Rio Tinto, tel +61 3 9283 3333 or fax +61 3 9283 3707.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation