Weatherly’s Tschudi mine output rises 21% q/q in Sept quarter
JOHANNESBURG (miningweekly.com) – Copper cathode production at Aim-listed Weatherly International’s Tschudi mine, in Namibia, improved by 21% quarter-on-quarter to 4 105 t in the quarter ended September 30.
Tschudi C1 costs reduced by 15% to $5 402/t.
“The company continues to experience lower-than-anticipated leach rates . . . and continues to compensate for this by exposing ore faster in the pit and stacking higher volumes of copper metal in ore, which together result in a higher C1 cost in the short to medium term,” the company said in a statement.
Weatherly continues to extend the heap leach pad area to provide additional time for the leaching of copper and has now completed the construction of four new leach pads.
Bulk earthworks and clay liners for the final remaining three pads are also complete.
The company noted that openpit groundwater inflows continue to increase as pit mining proceeds to deeper elevations; however, the flow rates are being managed adequately to ensure a reliable supply of ore for stacking.
Weatherly has also warned that it, and its subsidiaries, are unlikely to generate sufficient surplus cash to meet all loan repayments when due, particularly in the near term.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation