https://www.miningweekly.com

Vedanta approves $782m Gamsberg–Skorpion zinc project development

Vedanta Resources CEO Tom Albanese

Vedanta Resources CEO Tom Albanese

Photo by Duane Daws

13th November 2014

By: Creamer Media Reporter

  

Font size: - +

JOHANNESBURG (miningweekly.com) – Diversified miner Vedanta Resources has approved the investment of $782-million over three years on the development of the Gamsberg–Skorpion integrated zinc project.

About $630-million would be spent on developing a 250 000 t/y openpit zinc mine, concentrator plant and associated infrastructure at Gamsberg, near Aggeneys, in the Northern Cape.

The balance would be used on the development of an integrated 150 000 t/y roaster at the Skorpion Zinc refinery, in Namibia, to enable it to treat zinc sulphide deposits from the Gamsberg mine to produce high-grade zinc. This would also extend the life of the Skorpion Zinc operation, which had previously been expected to close down in 2015.

“The Gamsberg–Skorpion integrated zinc project is central to Vedanta’s long-term aspirations for Southern Africa. The output from Gamsberg, coupled with extending the life of the world-class refinery at Skorpion Zinc, in Namibia, will make the Southern African region one of the most important suppliers of refined zinc globally.

“That will also result in these operations forming one of the cornerstones of our operations in Africa and will partially offset the loss of volume resulting from the end-of-life of mine at Lisheen, in Ireland,” commented Vedanta CEO Tom Albanese.

Black Mountain Mining, in which Vedanta’s Sesa Sterlite subsidiary holds 74% and South Africa’s Exxaro Resources 26%, would operate the Gamsberg–Skoprion project.

The investment decision was made following the presentation of a detailed feasibility study for the mining project to Vedanta’s board. Work was already under way to establish a pilot plant for the refinery conversion, while preliminary work on financing options had started.

The first phase of the Gamsberg openpit mine was estimated to have a 13-year life span, with the first ore likely to be produced in 2017/18.

About 1 500 jobs will be created during the construction phase, while the mine would provide employment for 500 employees once operational.

H1 PERFORMANCE
Meanwhile, Vedanta on Thursday reported earnings before interest, taxation, depreciation and amortisation of $2.1-billion for the six months ended September 30. Revenue for the six months under review rose 6% year-on-year to $6.5-billion.

Its Zinc India division reported mined metal output of 375 706 t, 18% lower than that produced in the prior comparable period.

Production at the Zinc International division, which includes its African zinc operations and the Lisheen mine, in Ireland, fell 17% year-on-year to 196 000 t.

Refined zinc metal output at Skorpion had been lower owing to unplanned maintenance activities at the mill. Zinc/lead mine output at Lisheen dropped owing to lower grades, while the Black Mountain mine had experienced grade slippage, also contributing to the lower overall output.

Vedanta expected the Zinc International division to deliver output of between 330 000 and 340 000 t for the full year, compared with the 364 000 t produced in the financial year ended March 31, 2014.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

Latest News

Magazine video image
Magazine round up | 29 March 2024
Updated 4 hours ago

Showroom

Alco-Safe
Alco-Safe

An unmanned breathalyser that is made to be tough and simple to use. Can be used in any environment for operator-free breathalyser testing.

VISIT SHOWROOM 
Universal Storage Systems (SA)
Universal Storage Systems (SA)

South African leader in Steel -Racking, -Shelving, and -Mezzanine flooring. Universal has innovated an approach which encompasses conceptualising,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Hyphen, Eva mine, ferrochrome price make headlines
Hyphen, Eva mine, ferrochrome price make headlines
27th March 2024
Resources Watch
Resources Watch
27th March 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.117 0.152s - 112pq - 2rq
Subscribe Now