Urquhart Point heavy mineral sands project, Australia
Name of the Project
Urquhart Point heavy mineral sands (HMS) project.
Location
Queensland, Australia.
Client
Metallica Minerals and joint venture (JV) partner Ozore Resources.
Project Description
A positive feasibility on the Urquhart Point project supports the economics for a five-year mine life based on current ore reserves of 1.18-million tonnes grading at 9.5% heavy minerals, 8% oversize and 1% slimes. The heavy minerals assemblage is estimated to be 11.7% zircon, 13.6% rutile and 13.1% ilmenite. The reserves are located at surface, averaging between 1.5 m and 2 m in thickness.
The feasibility study proposes a simple, shallow dry-sand mining and conventional wet gravity-separation plant operation using spirals, with no chemicals required, to produce a mixed heavy-mineral concentrate product.
Concentrate production is estimated at 87 000 t, with an average valuable heavy mineral assemblage of 14.8% zircon, 17.3% rutile and 16.2% ilmenite, with the balance comprising predominantly iron-oxide sands.
Jobs to be Created
Not stated.
Net Present Value/Internal Rate of Return
The estimated project pretax net present value is A$4.9-million and the internal rate of return is 69%, with a one-year payback period from the start of operations.
Value
Capital expenditure is estimated at A$6.5-million.
Duration
First production from Urquhart is expected during the second quarter of 2017.
Latest Developments
The modularised HMS processing plant built in South Africa, arrived in Australia in December 2015 and is currently stored near Brisbane. Given the continuing low heavy mineral sands prices, the JV has deferred construction of the processing plant to focus on the higher value bauxite project.
Following several approaches from third parties, the JV is progressing several HMS options that may deliver value to this asset within the JV.
The HMS development plan can be implemented very quickly to deliver production if there is an improvement in commodity prices.
Key Contracts and Suppliers
None stated.
On Budget and on Time?
Not stated.
Contact Details for Project Information
Metallica Minerals, tel +61 7 3249 3000, fax +61 7 3249 3001 or email admin@metallicaminerals.com.au.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation