https://www.miningweekly.com

Avenira's Senegal project moves into operational stage

3rd October 2016

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

  

Font size: - +

PERTH (miningweekly.com) – First phosphate product from the Baobab project, in Senegal, has been trucked to the Port of Dakar, ASX-listed Avenira reports.

“The Baobab phosphate project continues to progress steadily and it is excellent to see the first trucking of phosphate product to the stockpile at the Port of Dakar, some 145 km from the mine site,” said Avenira MD Cliff Lawrenson.

“The project is now moving into operational stage with appropriate procedures and protocols in place. As expected, the annual wet season slowed processing and drying of the phosphate product, and initial trucking operations. However, wet conditions are now easing, allowing for more routine operations with first shipping our priority.”

The Baobab project is being developed in an initial Stage 1 operation, producing 500 000 t/y of phosphate concentrate. Under close geological supervision, phosphate mineralisation has already been uncovered on the western side of the Stage 1 openpit.

Edited by Creamer Media Reporter

Comments

Latest News

PGMs and green hydrogen make headlines
PGMs and green hydrogen make headlines
19th April 2024

Showroom

Universal Storage Systems (SA)
Universal Storage Systems (SA)

South African leader in Steel -Racking, -Shelving, and -Mezzanine flooring. Universal has innovated an approach which encompasses conceptualising,...

VISIT SHOWROOM 
Condra Cranes
Condra Cranes

ISO-certified Condra manufactures overhead cranes, portal cranes, cantilever cranes and crane components: hoists, drives, end-carriages, brakes and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 19 April 2024
Magazine round up | 19 April 2024
19th April 2024
Resources Watch
Resources Watch
17th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.161 0.2s - 88pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: