Triton soars on $2bn offtake deal
PERTH (miningweekly.com) – The share price of graphite hopeful Triton Minerals soared by nearly 65% on Wednesday, as the company announced that it had signed a binding offtake agreement worth $2-billion.
Under the terms of an agreement inked with China’s Yichang Xincheng Graphite Company, Triton would supply 100 000 t/y of graphite concentrate for a period of 20 years, with the graphite to be priced at a minimum sales price of $1 000/t.
“This is a very special day for Triton as this binding commercial agreement is with a graphite specialist organisation that has mined, manufactured and sold expended graphite products for nearly 20 years,” said Triton MD and CEO Brad Boyle.
A recent scoping study into Triton’s Nicada Hill graphite project, in Mozambique, estimated that the project could support production of 210 000 t/y of graphite concentrate.
The scoping study was based on a 51-million-tonne indicated resource, grading 12.4% graphitic carbon, for 6.3-million tonnes, and incorporated a 1.8-million-tonne-a-year throughput plant.
It was estimated that the project would require a capital investment of about $110-million, while the free-on-board cash costs were estimated at $315/t.
Production would likely start in 2017, and the project was estimated to have an initial mine life of 30 years.
Boyle noted that with the adoption of the binding long-term offtake agreement, Triton was now positioned to continue with the rapid development of the large scale production.
The offtake agreement would be subject to Triton receiving all government approvals, commissioning the processing plant and achieving commercial production within 36 months of signing the agreement.
Triton shares were trading at a high of 71c each on Wednesday, up from a low of 52.5c each.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation