https://www.miningweekly.com

Thalanga plant ramping up

27th September 2017

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – The Thalanga mill, in Queensland, has ramped up to a processing rate of 325 000 t/y, exceeding the project’s 300 000 t/y nameplate capacity, ASX-listed Red River Resources reported on Wednesday.

The ramp-up of the Thalanga zinc project has been completed ahead of schedule and about A$1-million under budget, with 13 500 t of low- to medium-grade ore processed since production started in September.

Red River said that high-grade ore from the West 45 deposit was being blended into the mill feed, and first concentrate deliveries were expected to start in the coming weeks as concentrate stocks increased.

First cash flow was expected to follow shortly after.

The project, which has been on care and maintenance since 2012, is expected to produce an average 21 400 t/y of zinc, 3 600 t/y of copper, 5 000 t/y of lead, 2 000 oz/y of gold and 370 000 oz/y of silver in concentrate over an initial five-year mine life.

Edited by Creamer Media Reporter

Comments

Showroom

Rio-Carb
Rio-Carb

Our Easy Access Chute concept was developed to reduce the risks related to liner maintenance. Currently, replacing wear liners require that...

VISIT SHOWROOM 
Immersive Technologies
Immersive Technologies

Immersive Technologies is the world's largest, proven and tested supplier of simulator training solutions to the global resources industry.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Hyphen, Eva mine, ferrochrome price make headlines
Hyphen, Eva mine, ferrochrome price make headlines
27th March 2024
Resources Watch
Resources Watch
27th March 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.099 0.131s - 88pq - 2rq
Subscribe Now