https://www.miningweekly.com

Terex® Minerals Processing Systems Launches The Large Capacity Mj47 Primary Jaw Module

28th August 2014

  

Font size: - +

This article has been supplied as a media statement and is not written by Creamer Media. It may be available only for a limited time on this website.

Terex Minerals  (0.25 MB)

Terex Minerals Processing Systems has launched the new MJ47 primary jaw crusher module, increasing the application capabilities and crushing capacity of its existing modular product range with their largest jaw module to date. The Terex® MJ47 jaw crusher module is designed for large quarries or contractors that want a stationary type design without the complexity of a normal stick-built plant.

The MJ47 module features the robust, 36" x 48" (914mm x 1219mm) Terex® Jaques ST47 jaw crusher.
Other key features include the Terex® Simplicity 51" x 24' (1.3 m x 7.3 m) heavy-duty double-deck vibrating grizzly feeder,  large capacity truck dump hopper,  discharge conveyor, extra heavy-duty galvanized/ painted I-beam frame, wrap-around maintenance access platform, stairs and guard rails. 

The modular product line consists of several pre-designed static and semi-static crushing and screening “plug and play” modules. Set-up time and ease of operation is aided by the simplicity of the modular product range. Modules are designed to fit and work together interchangeably. All Terex MPS modules bolt together on site and require minimal on-site wiring.

To watch Creamer Media's latest video reports, click here
 

Edited by Creamer Media Reporter

Comments

Showroom

Alco-Safe
Alco-Safe

An unmanned breathalyser that is made to be tough and simple to use. Can be used in any environment for operator-free breathalyser testing.

VISIT SHOWROOM 
M and J Mining
M and J Mining

M and J Mining are leading suppliers of physical support systems as used by the underground mining industry. Our selection of products are not...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Hyphen, Eva mine, ferrochrome price make headlines
Hyphen, Eva mine, ferrochrome price make headlines
27th March 2024
Resources Watch
Resources Watch
27th March 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.097 0.131s - 91pq - 2rq
Subscribe Now