https://www.miningweekly.com

Tenke Fungurume Phase 2 expansion project, Democratic Republic of Congo

5th April 2012

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

  

Font size: - +

Name and Location
Tenke Fungurume Phase 2 expansion project, Democratic Republic of Congo.

Client
Freeport-McMoRan Copper & Gold (FCX – 70%) and Lundin Mining (30%).

Project Description
The Phase 2 expansion project targets the addition of about 68 000 t/y of copper cathode production. The project is expected to increase copper production by 50% to about 195 000 t of copper cathode and 15 000 t of cobalt in hydroxide.

The expansion will include additional mining equipment, mill upgrades, acid plant expansion and a doubling of existing tank-house capacity that will result in excess solvent extraction and electrowinning capacity of copper cathode production.

Value
$850-million.

Duration
The expansion project is expected to be completed in 2013.

Latest Developments
The FCX board has approved the undertaking of the second phase of the project.

Key Contracts and Suppliers
None stated.

On Budget and on Time?
Not stated.

Contact Details for Project Information
FCX investor relations director David Joint, tel +1 504 582 4203 or email ir@fmi.com or external communications director Eric Kinneberg, tel +1 602 366 7994 or email mr@fmi.com.
Lundin Mining, tel +1 416 342 5560, fax +1 416 348 0303 or email info@lundinmining.com.
 

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Projects

Showroom

ESAB showroom image
ESAB South Africa

ESAB South Arica, the leading supplier of high-end welding and cutting products to the Southern African industrial market is based in...

VISIT SHOWROOM 
Booyco Electronics
Booyco Electronics

Booyco Electronics, South African pioneer of Proximity Detection Systems, offers safety solutions for underground and surface mining, quarrying,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.189 0.224s - 90pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: