https://www.miningweekly.com

Sumatra secures $45m funding for Tembang

Sumatra secures $45m funding for Tembang

Photo by Bloomberg

10th October 2014

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

  

Font size: - +

PERTH (miningweekly.com) – ASX-listed gold hopeful Sumatra Copper & Gold has secured a $45-million senior debt facility to fund the commercial development of its Tembang project, in Indonesia.

The three-year facility would have an interest rate of 7.5%, increasing to 10% after 18 months, with a redemption premium at the end of the loan period.

Up to 250.59-million warrants would be convertible into one Chess depository interest in the company, exercisable at a price of 5.7c each, with the three-year term on the warrant, from the drawdown date.

The facility would be drawn down in a lump sum, and some 85% of the cash generated from Tembang would be used to repay the facility each quarter. Interest would be paid quarterly.

Furthermore, Sumatra would enter into a hedging agreement with lead arrangers Nomura Singapore for gold hedge after the drawdown.

Sumatra would also be required to raise $5-million in equity within six months of the drawdown.

The ASX-listed company said on Friday that the facility would be subject to shareholder approval.

The recently updated definitive feasibility study on Tembang forecast a total production of 168 794 oz of gold and about 1.8-million ounces of silver, at a processing rate of 400 000 t/y. The project is expected to produce about 33 000 oz/y of gold and 345 000 oz/y of silver, at a cash operating cost of $470/oz.

The total capital cost of Tembang is estimated at $71.3-million. First production is targeted for mid-2015.

Edited by Creamer Media Reporter

Comments

Showroom

Rio-Carb
Rio-Carb

Our Easy Access Chute concept was developed to reduce the risks related to liner maintenance. Currently, replacing wear liners require that...

VISIT SHOWROOM 
Willard
Willard

Rooted in the hearts of South Africans, combining technology and a quest for perfection to bring you a battery of peerless standing. Willard...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.283 0.371s - 107pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: