https://www.miningweekly.com

Stoping ops get under way at Tanzania underground mine

2nd June 2015

By: Creamer Media Reporter

  

Font size: - +

JOHANNESBURG (miningweekly.com) – Stoping operations have started ahead of schedule at LSE-listed Acacia Mining’s Gokona Underground gold project, in Tanzania, with the first ore having been delivered to the process plant.

The gold miner said on Tuesday that the first stope had, to date, demonstrated the expected geotechnical characteristics and delivered both grade and ore tonnes in line with the mine plan. 

“We continue to expect a progressive increase in tonnes from the project as it ramps up through the year and maintain our current expectations for production from the Gokona Underground for the full year,” it added.

Gokona Underground, which formed part of Acacia’s larger North Mara mine, was expected to produce 450 000 oz of gold over a five-year life span, with all-in sustaining costs of below $750/oz.

The company previously said that production at North Mara, for the five years, would comprise a blend of high-grade underground material from Gokona and openpit material from the Nyabirama pit, enabling North Mara to sustain production rates in excess of 250 000 oz/y of gold.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

Showroom

WearCheck
WearCheck

Leading condition monitoring specialists, WearCheck, help boost machinery lifespan and reduce catastrophic component failure through the scientific...

VISIT SHOWROOM 
SAIMC (Society for Automation, Instrumentation, Mechatronics and Control)
SAIMC (Society for Automation, Instrumentation, Mechatronics and Control)

Education: Consulting with member companies to obtain the optimal benefits from their B-BBEE spending, skills resources as well as B-BBEE points

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Hyphen, Eva mine, ferrochrome price make headlines
Hyphen, Eva mine, ferrochrome price make headlines
27th March 2024
Resources Watch
Resources Watch
27th March 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.128 0.158s - 90pq - 2rq
Subscribe Now