https://www.miningweekly.com
Construction|Design|Flow|Infrastructure|Mining|PROJECT|Storage|Technology|Waste|Flow|Products|Environmental|Infrastructure|Waste|Operations
Construction|Design|Flow|Infrastructure|Mining|PROJECT|Storage|Technology|Waste|Flow|Products|Environmental|Infrastructure|Waste|Operations
construction|design|flow-company|infrastructure|mining|project|storage|technology|waste-company|flow-industry-term|products|environmental|infrastructure|waste|operations

South Star applies for graphite enviro permit, trial mining licence in Brazil

7th January 2020

By: Simone Liedtke

Creamer Media Social Media Editor & Senior Writer

     

Font size: - +

TSX-V-listed South Star Mining has completed and formally submitted the environmental permitting documents to the responsible permitting consortium for the construction and operation of a 5 000 t/y pilot plant facility at its Santa Cruz graphite project, in Brazil.

The company will also be submitting the trial mining licensing documents to the National Mining Agency, South Star president and CEO Richard Pearce said on Monday.

The pilot plant operations will provide short-term cash flow from operations and allow the Canadian miner to qualify bulk samples in the marketplace and establish future, firm offtake agreements.

Pearce noted that the company has continued to “work diligently” to develop commercial relationships with key players, both in Brazil and internationally, and said that the company has received “excellent feedback” on its shipping samples to date.

“We will monitor closely the permitting process and will be using the first half of 2020 to get the financing in place to construct and commission the pilot plant facilities,” he commented.

Construction is expected to take between eight and ten months.

The goal of the pilot plant operations is to prove the economic and technical viability of the project at a small scale, while also allowing the company to produce and qualify large scale samples in the marketplace.

The pilot plant will allow the company to test and optimise the flowsheet, develop the key commercial relationships and optimise the production of products demanded in the marketplace, given the inherent, high-quality nature of the concentrates produced to date.

The 5 000 t/y concentrate pilot plant is Phase 1 of the proposed path to production and includes a small-pit pilot processing plant, as well as filtered tails technology, waste storage facility for co-disposal of wasterock and filtered tails, and civil infrastructure.

The experience gained and commercial relationships established from Phase 1 operations will then be used to scale up the operations as part of the Phase 2 expansion plan.

The Phase 2 production facility will be similar in layout and process technology but will be able to produce 25 000 t/y of high-quality concentrate.

The upcoming prefeasibility study (PFS) results, expected in January of 2020, will present the detailed design of the Phase 1 facilities along with the PFS level design for the Phase 2 facilities and the maiden reserve estimate, the company confirmed.

Edited by Mariaan Webb
Creamer Media Senior Deputy Editor Online

Comments

Latest News

Resources Watch
Resources Watch
17th April 2024

Showroom

Condra Cranes
Condra Cranes

ISO-certified Condra manufactures overhead cranes, portal cranes, cantilever cranes and crane components: hoists, drives, end-carriages, brakes and...

VISIT SHOWROOM 
Schauenburg SmartMine IoT
Schauenburg SmartMine IoT

SmartMine IoT has been developed with the mining industry in mind, to provides our customers with powerful business intelligence and data modelling...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Resources Watch
Resources Watch
17th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.178 0.213s - 95pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: