https://www.miningweekly.com

Sibanye ups 2014 production guidance

Sibanye ups 2014 production guidance

Photo by Bloomberg

4th June 2014

By: Creamer Media Reporter

  

Font size: - +

JOHANNESBURG (miningweekly.com) – JSE- and NYSE-listed Sibanye Gold expects its gold output to increase to 1.58-million ounces for 2014.

This would include about 158 000 oz of gold from the Cooke Operation, which would be consolidated into Sibanye from this month.

The gold miner had produced 1.43-million ounces of gold last year.

Total cash cost, including the Cooke Operation, would increase from R270 000/kg, or $800/oz, to R285 000/kg, or $845/oz, while its all-in cost would rise from R360 000/kg, or $1 070/oz, to R365 000/kg, or $1 080/oz.

Further, the company, which on Wednesday presented a strategic, technical and operational update to investors, analysts and the media, also reported that its headline earnings a share for the six months ending June 30 would likely be 20% lower than that of the first half of the previous year.

This was owing to an increase in the weighted average number of shares in issue.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

Latest News

The QB mine in Chile is ramping up.
Teck increases copper production with QB ramp-up
25th April 2024 By: Mariaan Webb

Showroom

Alco-Safe

Developed to exceed the latest EN 15964 standards for police breathalysers proving that it will remain accurate and reliable for many years to come.

VISIT SHOWROOM 
Flameblock
Flameblock

FlameBlock is a proudly South African company that engineers, manufactures and supplies fire intumescent and retardant products to the fire...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.106 0.142s - 90pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: