GOLD 1773.83 $/ozChange: 16.93
PLATINUM 1717.50 $/ozChange: -1.50
R/$ exchange 7.73Change: 0.00
R/€ exchange 10.25Change: 0.00
 
We have detected that the browser you are using is no longer supported. As a result, some content may not display correctly.
We suggest that you upgrade to the latest version of any of the following browsers:
         
close notification
powered by
Advanced Search
 
 
 
Home
 
Most Popular Articles
 
 
SILVER
Scorpio Mining Q4 production rises at flagship mine
 
28th January 2012
TEXT SIZE
Text Smaller Disabled Text Bigger
 

Canada's Scorpio Mining Corp said production at its flagship Nuestra Señora mine in Mexico rose about 13%, helped by improved mining practises.

Fourth-quarter production at the silver-zinc-copper-lead plant totalled 694 538 silver equivalent ounces, compared with 612 941 silver equivalent ounces a year ago.

The company said it has improved its mining practices to enhance grade control, reduce dilution and increase recovery.

Total plant throughput in the quarter rose 17% to 131 581 t.

The company sees total plant throughput in 2012 to increase by about 2% to 519 000 oz.

Shares of the Vancouver-based company closed at C$2 on Thursday on the Toronto Stock Exchange.

Edited by: Reuters
FULL Access to Mining Weekly and Engineering News - Subscribe Now!
Subscribe Now Login
 
 
 
 
 
Hide Comments  
 
This article contains no Comments

 
 
All comments must be approved by our editors, click here to read the editorial guidelines for comments. Please allow some time for our editors to approve your comment after posting.
 * Required Fields

image
image
 *
 

 

image
image
 *
 

image
image
 

Verification Image

image
image
 * Please enter the text you see in the above image.