https://www.miningweekly.com

Saldanha port’s iron-ore facility to shut for maintenance from Sept 26

17th September 2018

By: Marleny Arnoldi

Deputy Editor Online

     

Font size: - +

Transnet Port Terminal’s (TPT’s) Saldanha iron-ore plant will shut down from September 26, as part of its yearly maintenance plan across mechanical, electrical and structural works.

TPT Cape Channel GM Velile Dube states that maintenance is a critical necessity at this stage, since the facility has already handled more than 27-million tonnes of cargo this financial year.

“By constantly addressing efficiency and productivity improvements through this kind of shutdown, it will further support our goal of becoming a top five terminal operator in the next five years, in line with TPT’s strategy to be recognised as a world-class logistics and freight solutions terminal operation,” Dube said.

The maintenance will include redeployment of equipment where necessary, conveyor belt replacement on the stacker reclaimer, as well as bucket wheel and transfer chute repairs.

Some of the other areas that will undergo major maintenance work are Ship Loader 1 chute repairs, with tiling and structural bolt replacements and repairs, dust plant filter replacements and yearly fire suppression tests.

Boasting the largest natural, deep-water port in South Africa, TPT’s Saldanha terminal is able to accommodate Panamax and Cape-sized vessels.

The terminal remains the largest iron-ore export facility in Africa, loading between 21 and 32 vessels a month.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

Showroom

Schauenburg SmartMine IoT
Schauenburg SmartMine IoT

SmartMine IoT has been developed with the mining industry in mind, to provides our customers with powerful business intelligence and data modelling...

VISIT SHOWROOM 
Booyco Electronics
Booyco Electronics

Booyco Electronics, South African pioneer of Proximity Detection Systems, offers safety solutions for underground and surface mining, quarrying,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (12/04/2024)
12th April 2024 By: Martin Creamer
Magazine round up | 12 April 2024
Magazine round up | 12 April 2024
12th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.148 0.181s - 90pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: