https://www.miningweekly.com

Qld declares Adani’s Carmichael ‘critical’ to fast-track project

Qld declares Adani’s Carmichael ‘critical’ to fast-track project

Photo by Bloomberg

10th October 2016

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

  

Font size: - +

PERTH (miningweekly.com) –The Queensland government has invoked special power to progress the A$21.7-billion Carmichael coal and rail project being developed by Indian major Adani.

The combined mine, rail and associated water infrastructure have all been declared “critical” infrastructure, the first time this has happened in seven years, with State Development Minister Dr Anthony Lynham saying over the weekend that the project’s special “prescribed project” status had also been renewed and expanded to include its water infrastructure.

Lynham said his decision would mean less red tape for the proposed project and the jobs and business opportunities it offered.

“This step bundles together major elements of the project for the first time – the mine, the 389 km rail line, and the water infrastructure, including a pipeline, pumping stations and a dam upgrade,” he said.

“It makes it more efficient to establish easements for infrastructure like the water pipeline and the rail, and expands the Coordinator-General’s power to ensure timely approvals.”

Lynham said the declaration was based on advice from the independent Coordinator-General, who continued to meet regularly with Adani to progress the project.

The proposed Carmichael project will comprise an opencut and underground mine, running for a period of 90 years and producing an average 60-million tonnes a year of thermal coal.

The Carmichael coal, railway and port project includes building Australia’s largest thermal coal mine, linked by a new 388 km standard gauge rail line to a new terminal at Abbot Point port near Bowen. It received approval from Minister Lynham in April this year, despite unresolved legal challenges and the prospect of further court appeals.

“Adani has now obtained all the necessary primary approvals for its mine, rail and port project, and most importantly, I have granted the mining leases.

“At a state level, the only key approvals remaining are water licences and Adani is actively working on those with my Department of Natural Resources and Mines,” Lynham said.

Edited by Creamer Media Reporter

Comments

Showroom

SAIMC (Society for Automation, Instrumentation, Mechatronics and Control)
SAIMC (Society for Automation, Instrumentation, Mechatronics and Control)

Education: Consulting with member companies to obtain the optimal benefits from their B-BBEE spending, skills resources as well as B-BBEE points

VISIT SHOWROOM 
Booyco Electronics
Booyco Electronics

Booyco Electronics, South African pioneer of Proximity Detection Systems, offers safety solutions for underground and surface mining, quarrying,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 19 April 2024
Magazine round up | 19 April 2024
19th April 2024
Resources Watch
Resources Watch
17th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.142 0.193s - 107pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: