https://www.miningweekly.com

Production falters in March quarter, but Tiger maintains expectations

30th April 2015

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

  

Font size: - +

PERTH (miningweekly.com) – Copper cathode producer Tiger Resources has maintained its full-year output expectations despite reporting a decline in production during the quarter ended March, owing to the wet season.

During the three months making up the first quarter of 2015, Tiger produced 5 723 t of copper and 1 012 t of copper cathode, compared with the 6 438 t of copper and 1 603 t of cathode produced in the fourth quarter of 2014.

The miner said on Thursday that while production was down slightly as a result of the wet weather conditions, the company’s operations still performed 5% ahead of budget for the quarter.

C1 costs for the quarter under review increased slightly from the $1.81/lb reported in the December quarter, to $1.84/lb, on the back of lower production.

Cathode sales for the quarter reached 6 314 t, with Tiger achieving an average copper price of $5 771/t sold. The miner noted that at the end of the March quarter, some 1 012 t of copper cathode remained in inventory, with a sales value of some $6.2-million.

Tiger on Thursday maintained its full-year production guidance of 25 000 t of copper cathode, at a cash operating cost of between $1.30/lb and $1.40/lb, and an all-in sustaining cost of between $1.57/lb and $1.67/lb.

Edited by Creamer Media Reporter

Comments

Latest News

Amplats CEO Craig Miller
Amplats posts lower first-quarter output
23rd April 2024 By: Marleny Arnoldi

Showroom

AutoX
AutoX

We are dedicated to business excellence and innovation.

VISIT SHOWROOM 
Booyco Electronics
Booyco Electronics

Booyco Electronics, South African pioneer of Proximity Detection Systems, offers safety solutions for underground and surface mining, quarrying,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

PGMs and green hydrogen make headlines
PGMs and green hydrogen make headlines
19th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.089 0.127s - 88pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: