Çöpler sulphide project gets a boost as Alacer inks $250m financing deal
TORONTO (miningweekly.com) – TSX- and ASX-listed Alacer Gold has secured a $250-million senior secured project finance facility with lending consortium BNP Paribas (Suisse), ING Bank and Société Générale Corporate & Investment Banking.
Alacer Gold has an 80% interest in the Çöpler gold mine, in Turkey, where the corporation continues detailed engineering and procurement of long-lead-time items for the Çöpler sulphide project.
Alacer president and CEO Rod Antal said in a statement on Monday that the facility represented yet another step forward in derisking the sulphide project and further strengthened Alacer's balance sheet, enabling increased flexibility to advance growth. "We are extremely pleased to have closed the agreement on very competitive terms with this lending syndicate,” he commented.
The facility had a seven-year term, with interest rates of Libor plus 2.5% to 2.95%. No mandatory gold hedging would be required and it included no early repayment penalties. Advances under the facility were subject to customary conditions precedent including executing security and construction documentation.
Cutfield Freeman & Co and Stikeman Elliott acted as advisers to Alacer on the transaction.
The $660-million sulphide project would consist of the introduction of a whole-ore pressure oxidation (POX) circuit that would extend the life of the mine and boost current resources and reserves.
The POX facility was expected to process sulphide ore at a rate of 5 000 t/d and would result in a 20-year mine life for the project.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation