Petropavlovsk achieves 19% increase in H1 gold production
JOHANNESBURG (miningweekly.com) – Russia-focused gold miner Petropavlovsk’s gold production increased by 19% year-on-year to 232 400 oz in the six months ended June 30.
The increase is supportive of the miner’s aim to produce between 420 000 oz and 460 000 oz for the full year.
The miner also posted a decline in net debt, which fell 5% to $570-million from $599-million at December 31, 2016.
"The increase in production in the first half was due to operational efficiencies. The operations are currently progressing in line with the company's plan," nonexecutive chairperson Ian Ashby said in a statement on Tuesday.
He added that the range in the production forecast for the full year reflected the company's conservative approach to the development of underground mines at Pioneer and Malomir.
The company said sales volumes in the first half amounted to 231 800 oz, 19% higher than the 195 400 oz sold in the prior comparable period.
The average realised gold price in the period was also up 5% from the prior year at $1 255/oz, compared with $1 194/oz.
Of the Russia-based miner's four operations, the Pioneer, Malomir and Albyn mines all achieved a lift in output in the first half of the year, compared with the prior year; however, the Pokrovskiy mine reported a year-on-year decline in output.
At the end of June, Petropavlovsk had hedging contracts in place for 500 000 oz of gold at an average price of $1 252/oz.
The main sources of low-grade ore were pits of the Alexandra, Yuzhnaya and Promezhutachnaya zones. This ore was blended with lower-grade material from stockpiles.
The development of the North East Bakhmut underground mine progressed as planned.
Underground work during the half-year totalled 1 446 m3 and the first ore was mined in June.
The significant increase in doré gold production in relation to gold recovered is mainly owing to the successful implementation of measures for cleaning resin and the resulting reduction in gold in circuit.
The interim results are to be released in the week starting on September 11.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation