https://www.miningweekly.com

Petra Diamonds on track to reach full-year production target

Petra Diamonds CEO Johan Dippenaar

Petra Diamonds CEO Johan Dippenaar

23rd January 2017

By: Megan van Wyngaardt

Creamer Media Contributing Editor Online

     

Font size: - +

JOHANNESBURG (miningweekly.com) – Production at FTSE 250 miner Petra Diamonds’ operations increased 24% to 2.01-million carats in the first half of the year, ended December 31, owing to a higher contribution from undiluted run-of-mine (RoM) ore leading to improved grades, and additional tailings production from its Kimberley Ekapa Mining joint venture (JV) in the Northern Cape.

During the six months under review, the company’s revenue also increased 48% to $228.5-million, owing to increased sales, which rose 47% to 1.91-million carats.

The company on Monday said it remained on track to deliver its guided full-year production of between 4.4-million and 4.6-million carats.

“We have delivered strong operational results . . . and will continue to advance our expansion programmes,” said CEO Johan Dippenaar, adding that the company would also experience a reduction in capital expenditure as its capital projects come to fruition.

Petra’s expansion projects include the underground projects at its Finsch diamond mine’s Block 5 SLC and its Cullinan C-Cut Phase 1. Commissioning of the new Cullinan plant is set to start towards the third quarter of the year.

Finsch's RoM carat production increased 9% to 816 001 ct in the six months to December 31, driven by improved grades, while Cullinan's diamond production increased 30% to 419 754 ct.

Attributable production from the Kimberley Ekapa Mining JV was 432 174 ct for the six months under review, while the Williamson project’s diamond production increased 12% to 106 831 ct with larger volumes treated.

During the period, commissioning started on a newly installed mill section at Williamson and is expected to be completed during the third quarter. Once fully commissioned, both RoM grades and throughput will improve.

Production at Petra’s Koffiefontein was hampered during the six months under review by downtime required to resolve issues encountered in the ore-handling infrastructure. The mine is now set to deliver planned levels of production from the second half of the financial year, onwards.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

Latest News

The integration of Alamos' Island Gold mine (pictured) and Argonaut's Magino mine will create synergies of $515-million.
Alamos buys rival Argonaut
27th March 2024 By: Mariaan Webb

Showroom

SABAT
SABAT

From batteries for boats and jet skis, to batteries for cars and quad bikes, SABAT Batteries has positioned itself as the lifestyle battery of...

VISIT SHOWROOM 
Showroom image
Alcohol Breathalysers

Supplier & Distributor of the Widest Range of Accurate & Easy-to-Use Alcohol Breathalysers

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Hyphen, Eva mine, ferrochrome price make headlines
Hyphen, Eva mine, ferrochrome price make headlines
27th March 2024
Resources Watch
Resources Watch
27th March 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.083 0.119s - 88pq - 2rq
Subscribe Now