Olympic Dam mine, Australia
Name: Olympic Dam mine.
Location: The mine is located 560 km north-west of Adelaide, in South Australia.
Controlling Company: BHP Billiton.
Brief History: Olympic Dam was acquired in 2005 as part of the WMC Resources acquisition. Copper production began in 1988. Nominal milling capacity was raised to nine-million tonnes a year in 1999. In 2002, an optimisation project was completed on the mine. A new copper solvent extraction plant was commissioned in 2004.
Brief Description: The Olympic Dam site includes an underground mine and an integrated metallurgical processing plant.
Products: Copper cathode and uranium oxide. The mine also refines gold and silver bullion.
Geology/Mineralisation: Olympic Dam is a large polymetallic deposit of iron oxide/copper/uranium/gold mineralisation.
Reserves: Proven and probable reserves of sulphide as at June 30, 2015, were estimated at 484-million tonnes, grading 1.95% copper, 0.59 kg/t of uranium, 0,74 g/t of gold and 4 g/t of silver.
Resources: Mineral resources of sulphide as at June 30, 2015, were estimated at 10.1-billion tonnes, grading 0.78% copper, 0.25 kg/t of uranium, 0.30 g/t of gold and 1 g/t of silver.
Mining Method: Long-hole open stoping with cemented aggregate fill.
Major Infrastructure and Equipment: The underground mine extracts copper uranium ore and hauls the ore using an automated train and trucking network feeding underground crushing, storage and ore-hoisting facilities.
The processing plant consists of two grinding circuits through which high-quality copper concentrate is extracted from sulphide ore through a flotation extraction process. The operation includes a fully integrated metallurgical complex with a grinding and concentrating circuit; a hydrometallurgical plant, incorporating solvent-extraction circuits for copper and uranium; a copper smelter; a copper refinery and a recovery circuit for precious metals.
Prospects: The focus at Olympic Dam is to transform the existing operation to lower the cost of production safely and sustainably. BHP Billiton is progressing a prefeasibility study to examine potential future optimisation and expansion opportunities.
In addition, BHP has received approval from the Australian and South Australian governments in 2015 to build a site-based heap-leaching demonstration plant, as part of the company’s efforts to identify an alternative, less capital-intensive process for extracting metals from ore mined underground. Construction of the demonstration plant is subject to ongoing, off-site demonstration and testwork outcomes and board approvals.
Contact: Investor relations for Australia and Asia Tara Dines.
Contact Details:
BHP Billiton,
tel +61 3 9609 3333,
fax +61 3 9609 3015, and
email Tara.Dines@bhpbilliton.com.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation