Newmont evaluates increased output at Tanami
PERTH (miningweekly.com) – Gold miner Newmont Mining will reach a decision on the possible expansion of its Tanami operation later this year.
Newmont’s Asia Pacific leader Tom Palmer told the WA Mining Club this week that the company’s Full Potential programme had seen a 22% increase in production at Tanami, and reduced the project’s cost base by some 21% over the last 18 months.
One focus point of the Full Potential programme at Tanami looked at improving the way the company managed its mine control centre and establishing a system to ‘hot seat’ the trucks at crib time. By doing this, Newmont reduced the average truck cycle time by 10%.
This work also reduced variations and increased the payload from 55 t a load to 60 t a load, Palmer said, which resulted in a 6% productivity improvement with no capital costs.
He noted that the potential expansion of Tanami would involve building a second decline in the mine and incremental capacity in the plant to increase production and extend the mine life.
“The expansion could add incremental gold production of between 100 000 oz/y and 125 000 oz/y at lower overall costs for the first five years,” Palmer said.
If approved, Newmont was expecting production and cost improvements as early as 2017.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation