https://www.miningweekly.com

Mutamba mineral sands project, Mozambique

1st September 2017

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Mutamba mineral sands project.

Location
The project is located in the Inhambane province of Mozambique.

Client
The project is being developed by Savannah Resources and Rio Tinto.

Savannah has the right to earn a stake of up to 51% in the project, subject to key milestones being met.

Delivery of the scoping study increases Savannah’s interest in the project to 20%, and to 35% on the delivery of a prefeasibility study.

Project Description
A scoping study on the project has concluded that there is potential for a financially robust, long-life mineral sands project that is expected to provide excellent life-of-mine financial returns with relatively modest capital requirements. The project combines Savannah’s Jangamo project with Rio Tinto’s adjacent Mutamba project, which includes the Jangamo, Dongane and Ravene deposits, as well as the Chilubane deposit, which is located 180 km south-west of the Mutamba project.

Mutamba has an initial mine life of 30 years based on a resource of 451-million tonnes grading 6% total heavy minerals, based on a conceptual mine plan using 33% of the indicated resource and 67% of the inferred resource. Average yearly production, following ramp-up to a 15-million-tonne-a-year mining rate, has been estimated at 456 000 t of roasted ilmenite and 118 000 t of nonmagnetic concentrate (rutile and zircon).

Dozer trap mining methods have been selected for the project. Mined ore will be slurried and pumped to the nearby primary concentrator plant (PCP). The PCP has been sized for a nominal feed rate of 2 000 t/h to produce 800 000 t/y of heavy mineral concentrate (HMC), with a heavy mineral grade of more than 90%.

The PCP tailings will be pumped directly back into the mine void. The HMC will be trucked to the mineral separation plant (MSP), where it will be fed into the mineral separation circuit for processing to produce a magnetic roasted ilmenite product and a zircon-rich nonmagnetic concentrate. 

The MSP has been sized to process HMC at 105 t/h to produce about 70 t/h of roasted ilmenite and 15 t/h of nonmagnetic concentrate. Products will be trucked to the export facility and be stored in a shed adjacent to the barge loading facility before being exported.

Jobs to Be Created
The project will have an anticipated final workforce complement of 332 people, with more than 1 000 indirect jobs expected to be created. The consortium is targeting 95% local participation once operations become established.

Net Present Value/Internal Rate of Return
Using the Management Case One, the project has a pretax net present value, at a 10% discount rate, of $245-million and an internal rate of return of 23%, with a payback of four years.

Value
Preproduction capital expenditure has been estimated at $152-million, plus contingency of $7-million.

Duration
Production is targeted for 2020.

Latest Developments
Savannah Resources has appointed TZMI to undertake the first phase of a prefeasibility study (PFS) at the Mutamba mineral sands project.
 
The first phase, which is under way, will include a gap analysis, options review, project planning and budget finalisation for a second phase of the PFS.

The conclusion of a PFS for the project is an important strategic milestone for Savannah, as the company will, on completion, hold a 35% interest in the project, which is one of the largest undeveloped mineral sands deposits in the world.

Savannah has entered into a joint venture with Rio Tinto to develop the project and has the right to earn up to a 51% interest in the project by meeting certain milestones.

Earlier this month, construction started on the 20 t/h pilot plant for a bulk metallurgical testwork programme at the project.

Mineral sands engineering company Anubis Mocambique Limitada (AML) has been appointed to undertake the work, with the pilot plant set to produce bulk samples of concentrate for metallurgical and product testwork upon completion.

Construction and commissioning are expected to be completed by the end of this year.

Key Contracts and Suppliers
AML (turnkey reassembly and commissioning of the pilot plant, including site survey; installation of a site security fence with an access lockable gate and security post; bulk earthworks; preparation of the old railway line to be used as the construction access road; and civil works, structural reassembly, and processing equipment assembly).
TZMI (Phase 1 PFS).

On Budget and on Time?
Too early to state.

Contact Details for Project Information
Savannah Resources, David Archer, tel +44 20 7117 2489.

Edited by Creamer Media Reporter

Comments

Showroom

Rentech
Rentech

Rentech provides renewable energy products and services to the local and selected African markets. Supplying inverters, lithium and lead-acid...

VISIT SHOWROOM 
Weir Minerals Africa and Middle East
Weir Minerals Africa and Middle East

Weir Minerals Europe, Middle East and Africa is a global supplier of excellent minerals solutions, including pumps, valves, hydrocyclones,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Hyphen, Eva mine, ferrochrome price make headlines
Hyphen, Eva mine, ferrochrome price make headlines
27th March 2024
Resources Watch
Resources Watch
27th March 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.122 0.156s - 90pq - 2rq
Subscribe Now