Mining continues despite flooding at Teck's Highland Valley Copper ops
VANCOUVER (miningweekly.com) – Canada’s largest diversified miner, Teck Resources, has advised the market that it continues to mine areas unaffected by flooding at its Highland Valley Copper operations, in British Columbia, after unusual spring weather conditions and rapid snow melt resulted in water inflow into the Lornex and Valley pits.
Mill operations also continue without interruption, despite mining being temporarily suspended in the affected areas.
The miner reported on Sunday night that it was assessing the potential impact on production and that it was examining options to enhance dewatering. The assessment is expected to take several days.
Teck also reported that the operation’s tailings management facilities have not been impacted by the flooding in the region.
During the three months ended March 31, Teck’s copper business unit recorded about 20% lower sales than in the comparable quarter of 2016, mainly owing to lower output from Highland Valley Copper as the mine is currently in a phase of lower grade ore, as expected in the mine plan.
Copper output was significantly reduced in the first quarter at 16 400 t, or 47% lower than a year ago. This was mainly owing to lower grades and recoveries as a higher-grade phase of the Valley pit was exhausted in 2016 and significantly more lower grade ore from the Lornex pit was processed than in the same period last year. Mill throughput was 9% higher, which partially offset the grade decline. Grades are expected to gradually improve as the year progresses.
Molybdenum output for the quarter totalled 1.6-million pounds, 77% than a year ago owing to higher grades.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation