https://www.miningweekly.com

Manitok hits new production record

9th December 2016

By: Henry Lazenby

Creamer Media Deputy Editor: North America

  

Font size: - +

VANCOUVER (miningweekly.com) – TSX-V-listed Manitok Energy has reached a new production record of 7 100 barrels of oil equivalent a day (boe/d), based on field estimates, surpassing the previous record of 6 500 boe/d achieved in October.

Calgary-based Manitok, which focuses on Lithic Glauc (LG) oil reservoirs in south-east Alberta and Cardium oil reservoirs in west-central Alberta, notes that the output comprises 40% of light oil and liquids.

It ascribed the record output to placing three (two in Carseland and one in Wayne) of the four recently drilled oil wells in south-east Alberta on production before the end of November and to the fourth-quarter acquisition of about 1 750 boe/d comprising 34% light oils and natural gas liquids, which it had recently acquired from a private vendor for C$13.5-million.

Manitok stated that with the completion of four new wells for a total cost of about C$6.58-million, or an average of C$1.65-million per well, it has added about 1 800 boe/d (45% oil) of initial production capability within the LG formation. Manitok plans to drill a further two LG wells at Carseland before year-end. These two wells and the 10-04 well will be placed on production in 2017.

Third-quarter output totalled 4 276 boe/d (45% light oil and liquids), representing a 19% quarter-over-quarter increase.

Edited by Creamer Media Reporter

Comments

Showroom

Condra Cranes
Condra Cranes

ISO-certified Condra manufactures overhead cranes, portal cranes, cantilever cranes and crane components: hoists, drives, end-carriages, brakes and...

VISIT SHOWROOM 
John Thompson
John Thompson

John Thompson, the leader in energy and environmental solutions through value engineering and innovation, provides the following: design, engineer,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (12/04/2024)
12th April 2024 By: Martin Creamer

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.121 0.153s - 88pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: