Sovereign completes scoping study for Malawi graphite project
PERTH (miningweekly.com) – A scoping study into the Malingunde graphite project, in Malawi, has estimated that the project will cost $29-million to develop, supporting production of 44 000 t/y.
ASX-listed Sovereign Metals on Tuesday reported that the project was expected to have a mine life of some 17 years and a pay-back period of two years, based on a throughput of 475 000 t/y.
The project is estimated to have total operating costs of around $301/t of concentrate, placing it at the bottom of the graphite supply cost curve.
“The scoping study clearly demonstrates the project’s very strong commercial potential which is centered on very low operating and capital costs, and revenues derived from a premium product,” said Sovereign MD Julian Stephens.
“Importantly, the project is not reliant on an unrealistically large scale to reduce operating costs or overly optimistic graphite pricing forecasts. The very low operating cost nature of the project provides protection even against extreme downside pricing scenarios.”
Stephens said that the combination of low operating costs, low capital costs and high-quality concentrates enabled the company to focus on initial entry into existing primary end-markets, including refractories and foundries, allowing product to compete on price point with China.
The potential for entry into developing markets, such as the lithium-ion battery supply chain, is retained as future upside.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation