MacLean celebrates two production milestones: Scissor Truck 200 and Boom Truck 100 designed, manufactured, sold and shipped right here in Canada
Two production milestone units are ready to roll off the line at MacLean Engineering’s Collingwood, Ontario manufacturing facility: SL3 Scissor Lift #200 and BT3 Boom Truck #100, going to mines in Quebec and British Columbia, respectively.
“We’re known for our bolters and increasingly our battery electric fleet offer, especially in Canadian mining, so it’s fitting that our two utility vehicle production milestones are units being shipped to mines in Canada,” says MacLean President, Kevin MacLean. “We’re confident that our utility vehicle product line offer of safety, performance, reliability and parts commonality will stand the test of time at home and abroad in the mining world.”
Eldorado Gold purchased the 200th MacLean scissor lift for Lamaque Mine in Val d’Or, Quebec. This makes for a total of 15 MacLean machines on site, with five more on their way for 2019.
“Eldorado is an excellent corporate citizen in Val d’Or and a valued customer for MacLean. We’re honoured to work with them at Lamaque – the MacLean fleet will be well supported by our local branch for many years to come,” says Tony Caron, MacLean GM for Quebec and Latin America.
Centerra Gold’s Kemess Underground Project in BC’s northern interior is the destination for MacLean’s 100th boom truck. Kemess is a former open-pit gold and copper mine that is currently in the feasibility study stage for a block cave mining operation. Already on site is a MacLean ANFO charger, in preparation for underground mining to commence.
“Centerra chose MacLean to be their mobile unit provider based on previous positive experiences with our products. They also want to standardize their equipment and have fewer OEMs on site. MacLean’s reputation for service and support, along with equipment
reliability and durability, played an important part in their selection as well,” says Adam Howse, MacLean’s Business Development Manager for Western Canada and the US. “From our end, we’re excited to work with Centerra to help build Canada’s next underground block cave mine.”
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation