https://www.miningweekly.com
Construction|Flow|PROJECT|Water|Flow|Operations
Construction|Flow|PROJECT|Water|Flow|Operations
construction|flow-company|project|water|flow-industry-term|operations

Lydian wins water right, but illegal blockades keep project in limbo

20th February 2020

By: Creamer Media Reporter

     

Font size: - +

Canada’s Lydian International, which delisted from the TSX earlier this month, has been granted a water permit for its Amulsar project, in Armenia, but illegal blockades continue to prevent construction from resuming.

Lydian has been issued a permit to draw 11 ℓ/s from the Arpa river. The company had sought permission to draw water from the Arpa river on two prior occasions, with higher level flow rates (in excess of 40 ℓ/s) to support long-term operations, both of which were denied by the government.

The lower flow rate that Lydian applied for now should be enough to support completing construction of the Amulsar project.

“We recognise that the government of Armenia has granted Lydian Armenia a water use permit that would allow the company to recommence construction. However, the company is still deprived of access to its property by illegal blockades and has been unable to raise financing to complete construction of the Amulsar project as a result,” said president and CEO Edward Sellers.

He urged the government to take action to address the continuing illegality around the Amulsar project. 

“The restoration of the rule of law will serve the interests of thousands of Armenian citizens, including community members, employees, contractors and suppliers, as well as thousands of investors who invested in Armenia in good faith and with the hope that their legal rights would be protected.”

Edited by Mariaan Webb
Creamer Media Senior Deputy Editor Online

Comments

Showroom

AutoX
AutoX

We are dedicated to business excellence and innovation.

VISIT SHOWROOM 
Showroom image
Alcohol Breathalysers

Supplier & Distributor of the Widest Range of Accurate & Easy-to-Use Alcohol Breathalysers

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 19 April 2024
Magazine round up | 19 April 2024
19th April 2024
Resources Watch
Resources Watch
17th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.171 0.209s - 93pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: