Leagold reports maiden profit
VANCOUVER (miningweekly.com) – Gold producer Leagold Mining has reported its first ever net profit since it took control of the Los Filos mine, in Mexico, in April.
The Vancouver-headquartered company reported net earnings of $317 000, or nil per share, compared with the $7.63-million net loss, $0.06 a share, it suffered in the second quarter.
Leagold generated adjusted net earnings after tax of $5.2-million, which were somewhat lower when compared with the $6.4-million profit in the second quarter.
During the third quarter, Leagold generated total revenue of $60.9-million, compared with the second-quarter’s $67.5-million, while earnings before interest, taxes, depreciation and amortisation came to $15.1-million, an improvement compared with $14.2-million in the July quarter.
Earnings from mine operations improved to $8.9-million in the third quarter, compare with $8.5-million in the second quarter.
Gold sales were 47 263 oz, at an all-in sustaining cost (AISC) of $993/oz sold. This is attributable to the increased ore output from both the openpit and underground operations, as well as the initial impact from heap leach process efficiencies implemented in the second and third quarters.
Leagold is optimising the Los Filos operations with a focus on changes that result in significant and sustainable cost savings. The installation of the agglomerator to improve gold recoveries and the extension of the conveyor to improve ore delivery to the heap leach are both on schedule, with expected completion slated before year end and operations starting in the first quarter next year.
As at September 30, Leagold had cash and cash equivalents of $52.9-million.
Leagold has continued to advance the Bermejal Underground expansion project with ongoing exploration drilling programmes and it has made a start on the portal and ramp development. During the quarter, Leagold increased the Bermejal Underground measured and indicated mineral resources by 94% to 1.97-million ounces and added 820 000 oz to the inferred resource category.
As previously guided, the Los Filos Mine remains on track to produce between 95 000 oz and 110 000 oz of gold, at an AISC of $875/oz to $925/oz for the second half of 2017.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation