https://www.miningweekly.com

Leagold reports maiden profit

14th November 2017

By: Henry Lazenby

Creamer Media Deputy Editor: North America

     

Font size: - +

VANCOUVER (miningweekly.com) – Gold producer Leagold Mining has reported its first ever net profit since it took control of the Los Filos mine, in Mexico, in April.

The Vancouver-headquartered company reported net earnings of $317 000, or nil per share, compared with the $7.63-million net loss, $0.06 a share, it suffered in the second quarter.

Leagold generated adjusted net earnings after tax of $5.2-million, which were somewhat lower when compared with the $6.4-million profit in the second quarter.

During the third quarter, Leagold generated total revenue of $60.9-million, compared with the second-quarter’s $67.5-million, while earnings before interest, taxes, depreciation and amortisation came to $15.1-million, an improvement compared with $14.2-million in the July quarter.

Earnings from mine operations improved to $8.9-million in the third quarter, compare with $8.5-million in the second quarter.

Gold sales were 47 263 oz, at an all-in sustaining cost (AISC) of $993/oz sold. This is attributable to the increased ore output from both the openpit and underground operations, as well as the initial impact from heap leach process efficiencies implemented in the second and third quarters.

Leagold is optimising the Los Filos operations with a focus on changes that result in significant and sustainable cost savings. The installation of the agglomerator to improve gold recoveries and the extension of the conveyor to improve ore delivery to the heap leach are both on schedule, with expected completion slated before year end and operations starting in the first quarter next year.

As at September 30, Leagold had cash and cash equivalents of $52.9-million.

Leagold has continued to advance the Bermejal Underground expansion project with ongoing exploration drilling programmes and it has made a start on the portal and ramp development. During the quarter, Leagold increased the Bermejal Underground measured and indicated mineral resources by 94% to 1.97-million ounces and added 820 000 oz to the inferred resource category.

As previously guided, the Los Filos Mine remains on track to produce between 95 000 oz and 110 000 oz of gold, at an AISC of $875/oz to $925/oz for the second half of 2017.

Edited by Samantha Herbst
Creamer Media Deputy Editor

Comments

Showroom

SAIMC (Society for Automation, Instrumentation, Mechatronics and Control)
SAIMC (Society for Automation, Instrumentation, Mechatronics and Control)

Education: Consulting with member companies to obtain the optimal benefits from their B-BBEE spending, skills resources as well as B-BBEE points

VISIT SHOWROOM 
GreaseMax
GreaseMax

GreaseMax is a chemically operated automatic lubricator.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

PGMs and green hydrogen make headlines
PGMs and green hydrogen make headlines
19th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.091 0.128s - 90pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: